Starting values

<< Click to Display Table of Contents >>

Navigation:  Reference Commands > K > Kanal > Construction  Sparger >

Starting values

Previous pageReturn to chapter overviewNext page

 

 

re_ic_anfangswerte

 

After picking 2 pipe points the start values of the system have to be entered.

If you continue an already existing system the parameters of the picked system will be overtaken automatically.

 

Sprinkler_03

 

Dialogue-Options

 

Option

 

Description

Round duct material


Here the material for construction of pipework will be determined. (manufacturer, type)

Flexible and standing seam ducts are also availabe.

 

rtab_icon ... Button to edit the Material Manager for all trades.

Pressure stage DN


Here you can choose the pressure stage of the system.

Component parts will be suggested automatically with the equal flange dimension.

Length of component parts come from the table eo EN558.

Cross Section

 


Shows the cross section from start point to be used for construction.

If an already existing component part should be continued, the cross section will be overtaken automatically.

Round or oval parts are possible.

Pos.No.:

 


Assigns the first component part position number for construction.

All following parts will be automatically numbered in consecutive order.

These numbers are shown on screen and in the Parts list.

Start Height

 


The start height is the Absolute-Height of the ductwork in the building.

The upper, center and bottom edge of duct can be selected.

The other values will be calculated through the ductwork dimensions.

Direction

 


The direction determines the construction direction from the first ductwork point.

The direction of both clicked ductwork points will be shown.

Any angle can be used.

The main directions are:

horizontal:

000° - to the right on screen

090° - straight up on screen

180° - to the left on screen

270° - straight down on screen

vertical:

000° - horizontal construction

090° - vertical construction straight up

-90° - vertical construction straight down

tilted:

Ducts can be tilted around the horizontal axis.

e.g.: Cross-section example with roof slope:

 

hk_anfangswerte_abgekippt

Position


The position describes the direction of duct in relation to a wall, when both duct points are placed on a line or wall.

 

left:

Duct is set to the left of the line.

 

hk_anfangswerte_links

 

center:

Duct is set on the center of the line.

 

hk_anfangswerte_mittig

 

right:

Duct is set to the right of the line.

 

hk_anfangswerte_rechts

 

distance:

the distance between the duct and the line by settings left

and right.

 

hk_anfangswerte_abstand

Functional fields


(Place, Continuous construction, Cancel)

See chapter "Functional fields"