Construction Heating

<< Click to Display Table of Contents >>

Navigation:  Reference Commands > K > Kanal >

Construction Heating

Previous pageReturn to chapter overviewNext page

 

This function opens the drawing function for special fittings.

 

Click on 2 pipework points in plan. These points will first be shown as pipes in preview. The Special fitting shown at the end of pipework can be changed with corresponding buttons.

 

If Trade definition is activated, the automatic layer manegement will be activated for layers not defined by AX3000 (e.g. layer 0) after the first pipe point. The second pipe point can be selected afterwards.

 

 

                                Access to the command over:

   

AutoCAD/BricsCAD

Allplan

 

Command line: _KANAL1_H

 

Assistant: heizung_gew | Ventilation | kanal2

 

Toolbar: Heating | Heating Design | Allplan_H_19allplan_H_20

 

 

 

Drawing procedure for pipes:

 

1.

Activate the function.

2.

Pick starting point

KK_01

3.

Pick second point

KK_02

4.

These points will be shown as pipes in preview first.

KK_03

5.

The function for drawing Pipe parts opens.

You can here edit the Fittings as needed.

hk_anfangswerte